Trending Now
Four Reasons School Choice Is Good, but Federal...
The Tragedy of War
Medicaid Is Driving Deficits: Republicans Are Scarcely Tapping...
Fraud in Federal Programs
Wealth Generation and the Market Economy
PHL utilization rate for EU GSP+ hits record...
Domestic shipping to pick up slack as tariffs...
Maharlika remits P1.4-B dividend to Treasury 
NFA begins shipping subsidized rice to Cebu
Tobacco taxes need ‘calibration’ to reverse decline in...
  • About Us
  • Contacts
  • Email Whitelisting
  • Privacy Policy
  • Terms and Conditions
DailyProfitTips.com
  • Editor’s Pick
  • Economy
  • Investing
  • Politics
  • World News
EconomyEditor's Pick

Ceiling prices set for 4th green energy auction

by April 15, 2025
April 15, 2025

THE Energy Regulatory Commission (ERC) has issued its proposed ceiling prices for the fourth round of the green energy auction (GEA-4) which will be held this year, with the auction focused on integrated renewable energy and energy storage systems (IRESS).

In a notice, the ERC proposed a preliminary price of P4.1480 per kilowatt-hour (kWh) for ground-mounted solar, P5.9515 per kWh for floating solar, and P4.7679 per kWh for rooftop solar.

For other technologies, the ERC is looking to set a ceiling of P6.5134 per kWh for onshore wind and P5.2835 per kWh for solar systems equipped with energy storage.

GEA-4 will offer 10,478 megawatts (MW) of RE capacity, which include some that will be paired with battery energy storage systems, the Department of Energy (DoE) said last month.

This covers 3,940 MW of ground-mounted solar, 3,000 MW of floating solar, 48 MW of roof-mounted solar, and 2,390 MW of onshore wind.

The ERC determines the green energy auction reserve (GEAR) price, or the maximum price in pesos per kilowatt-hour that will serve as the ceiling price for the auction.

The ERC is scheduled to conduct public consultations on the proposed preliminary GEAR prices for GEA-4 next week.

The GEA program aims to promote RE as a primary source of energy through competitive selection. RE developers compete for incentivized fixed power rates by offering their lowest price for a certain capacity.

As a flagship government initiative, the program is expected to contribute to the government’s goal of 35% RE in the power generation mix by 2030.

Winning RE projects will be awarded a 20-year supply contract starting from the commercial operation date of the plant.

“By providing energy developers with opportunities to secure long-term contracts, GEA fosters sustainable energy production while ensuring a more stable, reliable, and greener power supply for the nation,” the DoE said. — Sheldeen Joy Talavera

previous post
NFA to auction rice to free up warehouse space
next post
I’m Saying Goodbye to the Cato Daily Podcast

Related Posts

Four Reasons School Choice Is Good, but Federal...

May 13, 2025

Medicaid Is Driving Deficits: Republicans Are Scarcely Tapping...

May 13, 2025

Fraud in Federal Programs

May 13, 2025

PHL utilization rate for EU GSP+ hits record...

May 13, 2025

Domestic shipping to pick up slack as tariffs...

May 13, 2025

Maharlika remits P1.4-B dividend to Treasury 

May 13, 2025

NFA begins shipping subsidized rice to Cebu

May 13, 2025

Tobacco taxes need ‘calibration’ to reverse decline in...

May 13, 2025

Capital gains tax hike expected to make land more...

May 13, 2025

A Tale of Two Trade Deals

May 12, 2025
Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!
    • About Us
    • Contacts
    • Email Whitelisting
    • Privacy Policy
    • Terms and Conditions

    Copyright © 2023 DailyProfitTips.com All Rights Reserved.

    DailyProfitTips.com
    • Editor’s Pick
    • Economy
    • Investing
    • Politics
    • World News