Trending Now
Ruling Against Ohio Scholarship Program Puts System Above...
Emergency Powers Are for Emergencies
NFA to resume corn procurement
11 renewable projects gain green-lane status in June
Offshore wind developers asked to disclose plans for...
ATEC launches Cabuyao semiconductor plant built for Taiwan’s...
Misdeclared shipments of onion, mackerel from China intercepted
PHL investment position minus $69.3B in Q1
Gov’t cash utilization rate hits 94% in May
PHL could benefit from shift away from US...
  • About Us
  • Contacts
  • Email Whitelisting
  • Privacy Policy
  • Terms and Conditions
DailyProfitTips.com
  • Editor’s Pick
  • Economy
  • Investing
  • Politics
  • World News
EconomyEditor's Pick

SMC’s Boracay toll bridge to undergo Swiss challenge

by June 1, 2025
June 1, 2025

THE P8.01-billion unsolicited proposal submitted by San Miguel Corp. (SMC) to build a toll bridge connecting the resort island of Boracay to the Panay mainland is scheduled to undergo a Swiss challenge by July, the Department of Public Works and Highways said.

“We are in the process of finalizing (approvals) with the local government. The plan of San Miguel to build the Boracay bridge has already received initial approval,” Public Works Secretary Manuel M. Bonoan told reporters last week.

“Before we subject it to Swiss challenge, we want to determine if it has a go-signal from the local government unit. We have to finalize the arrangements with the local government. If approved, then we will proceed with the Swiss challenge.”

Boracay is under the jurisdiction of the municipality of Malay, Aklan. In a Swiss challenge, rival bids to an unsolicited proposal will be invited, with the original proponent holding the right to match the best opposing bid.

The Public-Private Partnership (PPP) Center lists the project components as financing, design, construction, and maintenance of a 1.2-kilometer bridge between Boracay island and the Caticlan district of Malay.

The proposed bridge will be a two-way two-lane bridge with a provision for a bike lane and sidewalk on each side, the PPP Center said.

Mr. Bonoan said the conclusion of the May elections should mean the local government officials providing the necessary approvals will be in place shortly.

“We have to settle with new leadership; there will be changes with political personalities. So maybe between June or July,” Mr. Bonoan said.

The project is expected to help address Boracay’s growing solid and liquid waste management issues by providing reliable access and provisions for waste disposal, the PPP Center said. — Ashley Erika O. Jose

previous post
CAMPI backs law to formalize auto incentives
next post
NG borrowing surges to P390B in April

Related Posts

Ruling Against Ohio Scholarship Program Puts System Above...

July 1, 2025

Emergency Powers Are for Emergencies

July 1, 2025

NFA to resume corn procurement

July 1, 2025

11 renewable projects gain green-lane status in June

July 1, 2025

Offshore wind developers asked to disclose plans for...

July 1, 2025

ATEC launches Cabuyao semiconductor plant built for Taiwan’s...

July 1, 2025

Misdeclared shipments of onion, mackerel from China intercepted

July 1, 2025

PHL investment position minus $69.3B in Q1

July 1, 2025

Gov’t cash utilization rate hits 94% in May

July 1, 2025

PHL could benefit from shift away from US...

July 1, 2025
Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!
    • About Us
    • Contacts
    • Email Whitelisting
    • Privacy Policy
    • Terms and Conditions

    Copyright © 2025 DailyProfitTips.com All Rights Reserved.

    DailyProfitTips.com
    • Editor’s Pick
    • Economy
    • Investing
    • Politics
    • World News