Trending Now
Mining fiscal reform bill stalls over ore export...
Study ordered on feasibility of expanding P20 rice...
NG borrowing surges to P390B in April
SMC’s Boracay toll bridge to undergo Swiss challenge
CAMPI backs law to formalize auto incentives
Coffee seen as viable growth export to Europe...
Foreign chambers back passage of key reforms before...
Investor Lease Act amendments lack lessor protections —...
WB country partnership to focus on building PHL...
Engaging the independent consumer
  • About Us
  • Contacts
  • Email Whitelisting
  • Privacy Policy
  • Terms and Conditions
DailyProfitTips.com
  • Editor’s Pick
  • Economy
  • Investing
  • Politics
  • World News
EconomyEditor's Pick

5 RE projects endorsed for grid impact study

by May 21, 2025
May 21, 2025

THE Department of Energy (DoE) said it endorsed five renewable energy (RE) projects to undergo a system impact study (SIS) with the National Grid Corp. of the Philippines.

“In April 2025, the DoE issued five SIS endorsements, which are all new applications,” the DoE said in a posting on its website.

Such studies are conducted to determine the adequacy and capability of the grid to accommodate the new connection.

The DoE issued SIS endorsements to JBD Water Power, Inc.’s 200-MW Abra-Kalinga Wind Power Project in Kalinga; Freya Renewables, Inc.’s 160-MW E.B. Magalona Wind Power Project in Negros Occidental; and Amihan Power, Inc.’s 80-MW Presentacion 3 Wind Power Project in Camarines Sur; PAVI Green Camsur Renewable Energy, Inc.’s 50.104-MWp PAVI Green Naga Solar Power Project in Camarines Sur; and Energy Development Corp.’s 30-MW Botong-Rangas Geothermal Project in Sorsogon.

This year, the department has issued 40 SIS endorsements — 30 to renewable energy projects, two to conventional power projects, and eight to energy storage systems.

Meanwhile, the DoE has endorsed four power projects to the Energy Regulatory Commission.

The biggest project of the four was Isabel Ancillary Services Co. Ltd.’s 86.320-MW Isabel Modular Diesel Power Plant in Leyte.

The DoE also endorsed National Power Corp.’s 0.3-MW Jintotolo Diesel Power Plant in Masbate and 0.19-MW Sibolo Diesel Power Plant in Antique; and Amatera Renewable Energy Corp.’s 65.012-MWdc Vista Alegre Solar Power Project in Negros Occidental.

A certificate of endorsement (CoE) is a prerequisite for generation facilities to be issued a certificate of compliance, a license issued by the ERC that grants permission to operate.

In the first four months, the DoE issued 32 CoEs, of which 14 are conventional projects and 18 renewable energy projects. — Sheldeen Joy Talavera

previous post
More investments needed to support EPR law due to dearth of recyclers
next post
Expanded P20 rice program targets 14M beneficiaries

Related Posts

Mining fiscal reform bill stalls over ore export...

June 1, 2025

Study ordered on feasibility of expanding P20 rice...

June 1, 2025

NG borrowing surges to P390B in April

June 1, 2025

SMC’s Boracay toll bridge to undergo Swiss challenge

June 1, 2025

CAMPI backs law to formalize auto incentives

June 1, 2025

Coffee seen as viable growth export to Europe...

June 1, 2025

Foreign chambers back passage of key reforms before...

June 1, 2025

Investor Lease Act amendments lack lessor protections —...

June 1, 2025

WB country partnership to focus on building PHL...

June 1, 2025

Engaging the independent consumer

June 1, 2025
Enter Your Information Below To Receive Free Trading Ideas, Latest News And Articles.

    Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!
    • About Us
    • Contacts
    • Email Whitelisting
    • Privacy Policy
    • Terms and Conditions

    Copyright © 2025 DailyProfitTips.com All Rights Reserved.

    DailyProfitTips.com
    • Editor’s Pick
    • Economy
    • Investing
    • Politics
    • World News